I would like to calculate the number of the overlapping days between two date ranges. The 2 pairs of date ranges are read from the console in the format: yyyy-mm-dd
;
For example, if the two dates are
2020-01-05
2020-03-31
and
2020-01-05
2020-03-20
the program should find the days between 2020-01-05
and 2020-03-20
. However, it doesn't work. I would like to ask how can I fix this?
import java.time.LocalDate;
import java.time.temporal.ChronoUnit;
import java.util.Scanner;
public class Dates {
public static void main(String[] args) {
Scanner sc = new Scanner(System.in);
String a = sc.nextLine();
String b = sc.nextLine();
String c = sc.nextLine();
String d = sc.nextLine();
LocalDate ldt1 = LocalDate.parse(a);
LocalDate ldt2 = LocalDate.parse(b);
LocalDate ldt3 = LocalDate.parse(c);
LocalDate ldt4 = LocalDate.parse(d);
System.out.println(ChronoUnit.DAYS.between(ldt1,ldt2,ldt3,ldt4));
}
}
It’s a little more complicated than that (not badly).
String i1StartStr = "2020-01-05";
String i1EndStr = "2020-03-31";
String i2StartStr = "2020-01-05";
String i2EndStr = "2020-03-20";
LocalDate i1Start = LocalDate.parse(i1StartStr);
LocalDate i1End = LocalDate.parse(i1EndStr);
LocalDate i2Start = LocalDate.parse(i2StartStr);
LocalDate i2End = LocalDate.parse(i2EndStr);
if (i1End.isBefore(i1Start) || i2End.isBefore(i2Start)) {
System.out.println("Not proper intervals");
} else {
long numberOfOverlappingDates;
if (i1End.isBefore(i2Start) || i2End.isBefore(i1Start)) {
// no overlap
numberOfOverlappingDates = 0;
} else {
LocalDate laterStart = Collections.max(Arrays.asList(i1Start, i2Start));
LocalDate earlierEnd = Collections.min(Arrays.asList(i1End, i2End));
numberOfOverlappingDates = ChronoUnit.DAYS.between(laterStart, earlierEnd);
}
System.out.println("" + numberOfOverlappingDates + " days of overlap");
}
Output from the code as it stands here is:
75 days of overlap
I have also used better variable names. I believe the code is about self-explanatory now. I have introduced validation of the intervals that the user inputs.
If you want the number of days inclusive of both start and end dates, remember to add 1 to the return value from ChronoUnit.DAYS.between()
.