Search code examples
derbysonarqube

How do I delete or change the date on a project data measurement?


I ran an old copy of the code to have a baseline to compare to. Then accidentally ran the new code also set to back-dated. Can I change the date on the 2nd sample? can I delete the 2nd sample to do it over? I've gotten as far as using ij to connect to the derby db, but the output formatting looks bad, and I have no idea how to select top 10 * from table in derby to search for what table I should look at.


Solution

    1. Log in
    2. Click project that contains the snapshot you want to delete.
    3. History Deletion link on the left
    4. Click the button that corresponds with the correct snapshot row.