I have scheduled month-to-date Azure Cost export and it's perfectly running everyday and built a structure on top of this exports and visualizing the cost for my teams.
However, data export run is taking place at 4:30 PM UTC everyday and due to this reason, I have 2 days gap in my reports.
I checked
the details of the scheduled export and there is no configuration for time of export.
manualy trigger export in 06:30AM UTC and after successful run, "estimated next run" changed to next day 06:30 AM UTC. However, after the next day, export time again changed back to 04:30PM UTC.
I created a new export at 06:30AM UTC and run export,"estimated next run" changed to next day 06:30 AM UTC. However, again, after the next day, export time again changed back to 04:30PM UTC.
Is there any way to solve this and run this export before 06:30AM UTC everyday? Or should I create a trigger via ADF/Synapse/Logic App to trigger export mornings?
Bear çağatay yılmaz, the reply is no.
There is no way to have a grip on that. Is Microsoft that manages at what time that export takes place.
The Month-to-Date export should be called Month-to-2-days-ago export.