I know it is possible to run 1 set of tasks in parallel. For example, something like this:
begin >> [A, B, C, D,E] >> end
would run A, B, C, D, E all in parallel. However, I want to do something like this such that after begin, there are two workflows running in parallel. Something like:
A -> B -> C
begin -> -> end
D -> E -> F
What would be the correct syntax to achieve this?
Every split is like a starting point.
start_dag = start_task()
end_dag = end_task()
a = DummyOperator(task_id="a")
b = DummyOperator(task_id="b")
c = DummyOperator(task_id="c")
d = DummyOperator(task_id="d")
e = DummyOperator(task_id="e")
f = DummyOperator(task_id="f")
(start_dag >> [a, d])
(a >> b >> c >> end_dag)
(d >> e >> f >> end_dag)