Search code examples
mavenjbossseamjboss7.xseam3

Optimize deployment cycle for development


I use Seam3 + maven + jboss7 combination in my development. Would it be possible to optimize the loadup time when I do

mvn clean package jboss-as:redeploy

Currently this takes over 20 seconds with core2duo with an SSD (Mac Air).

In my workflow, it's common to make a lot of small changes and then redeploy and see changes. It's quite a big bottleneck with current setup, and it breaks my flow.

  1. Would it be possible to do proper hot-deployment over my configuration?

  2. Is there parameters for making startup faster when developing?


Solution

  • I found about JRebel. It's a gift that I would not have expected to fall upon me. This supports my workflow and makes me much more efficient. If you need hot-deployment, try it out!