I was looking for the verbal explanations of different performance testing types and saw a new one called "breakpoint test". Its explanation seemed very similar to stress testing for me. So what is the difference, or is there any difference?
Stress Test: A verification on the system performance during extremely high load which is way above the peak load
Breakpoint Test: This test determines the point of system failure by gradually increasing the number of simulated concurrent users.
As far as I know, we increase the load gradually while performing stress test too. So what is the difference between this two type?
From the workload point of view the approach is exactly the same, my understanding is:
More information: