google-apps-scriptgoogle-calendar-apieventtrigger

Google App Script - Calendar Update Trigger Firing 4 Times


Goal: When a secondary calendar event(s) in Google Workspace 1 is updated (new, edit, delete), update the primary calendar in Google Workspace 1 to add new, edit existing, or delete existing event(s).

Note: the secondary calendar in Google Workspace 1 is shared from Google Workspace 2. So the actual update to an event occurs in a secondary calendar in Google Workspace 2 but is almost immediately reflected as an update in the secondary calendar in Google Workspace 1.

Result: This is working as intended when run manually.

Issue: When a trigger is added manually that runs when the calendar is updated (not time-based), the trigger fires four concurrent executions of the script. This duplicates the calendar event four times on the secondary calendar in Google Workspace 1.

Attempted Resolve: I put a lock service in place. This does prevent the calendar event duplication. However, this causes three of the four executions to fail. This results in 3 emails being sent to me, one email for each time the script fails.

Question: How can I only allow this script to run once? I think the simple answer is to just put in an if/else that if locked, terminate script. I have looked and cannot find examples of how this would be coded.

See code and screenshots below.

function calEventUpdate(){
var lock = LockService.getScriptLock();
      lock.waitLock(15000);
     
     //code here 
    
    var id="e48a0bmth3sn787dotb4n2rtjs@group.calendar.google.com"; // CHANGE - id of the secondary calendar to pull events from (Anduin Out)
    
      var today=new Date();
      var enddate=new Date();
      enddate.setDate(today.getDate()+7); // how many days in advance to monitor and block off time
      
      var secondaryCal=CalendarApp.getCalendarById(id);
      var secondaryEvents=secondaryCal.getEvents(today,enddate);
    
    
      var primaryCal=CalendarApp.getDefaultCalendar();
      var primaryEvents=primaryCal.getEvents(today,enddate); // all primary calendar events
      
      var primaryEventTitle="Busy"; // update this to the text you'd like to appear in the new events created in primary calendar
      
      var stat=1;
      var evi, existingEvent; 
      var primaryEventsFiltered = []; // to contain primary calendar events that were previously created from secondary calendar
      var primaryEventsUpdated = []; // to contain primary calendar events that were updated from secondary calendar
      var primaryEventsCreated = []; // to contain primary calendar events that were created from secondary calendar
      var primaryEventsDeleted = []; // to contain primary calendar events previously created that have been deleted from secondary calendar
    
      Logger.log('Number of primaryEvents: ' + primaryEvents.length);  
      Logger.log('Number of secondaryEvents: ' + secondaryEvents.length);
      
      // create filtered list of existing primary calendar events that were previously created from the secondary calendar
      for (pev in primaryEvents)
      {
        var pEvent = primaryEvents[pev];
        if (pEvent.getTitle() == primaryEventTitle)
        { primaryEventsFiltered.push(pEvent); }
      }
    
      // process all events in secondary calendar
      for (sev in secondaryEvents)
      {
        stat=1;
        evi=secondaryEvents[sev];
        Utilities.sleep(1000); // added to prevent "too many updates" error on a busy calendar
        // if the secondary event has already been blocked in the primary calendar, update it
        for (existingEvent in primaryEventsFiltered)
          {
            var pEvent = primaryEventsFiltered[existingEvent];
            var secondaryTitle = evi.getTitle();
            var secondaryDesc = evi.getDescription();
            if ((pEvent.getStartTime().getTime()==evi.getStartTime().getTime()) && (pEvent.getEndTime().getTime()==evi.getEndTime().getTime()))
            {
              stat=0;
              pEvent.setTitle(primaryEventTitle);
              //pEvent.setDescription(secondaryTitle + '\n\n' + secondaryDesc);
              // event.setDescription(evi.getTitle() + '\n\n' + evi.getDescription());
              pEvent.setVisibility(CalendarApp.Visibility.PRIVATE); // set blocked time as private appointments in work calendar
              pEvent.setColor('9');
              primaryEventsUpdated.push(pEvent.getId());
              Logger.log('PRIMARY EVENT UPDATED'
                         + '\nprimaryId: ' + pEvent.getId() + ' \nprimaryTitle: ' + pEvent.getTitle() + ' \nprimaryDesc: ' + pEvent.getDescription());
            } 
          }
    
        if (stat==0) continue;    
        
        var d = evi.getStartTime();
        var n = d.getDay();
    
        if (evi.isAllDayEvent())
        {
          continue; // Do nothing if the event is an all-day or multi-day event. This script only syncs hour-based events
        }
        else if (n==1 || n==2 || n==3 || n==4 || n==5) // skip weekends. Delete this if you want to include weekends
        // if the secondary event does not exist in the primary calendar, create it
        {
          var newEvent = primaryCal.createEvent(primaryEventTitle,evi.getStartTime(),evi.getEndTime()); // change the Booked text to whatever you would like your merged event titles to be
          // alternative version below that copies the exact secondary event information into the primary calendar event
          // var newEvent = primaryCal.createEvent(evi.getTitle(),evi.getStartTime(),evi.getEndTime(), {location: evi.getLocation(), description: evi.getDescription()});  
          //newEvent.setDescription(evi.getTitle() + '\n\n' + evi.getDescription());
          newEvent.setVisibility(CalendarApp.Visibility.PRIVATE); // set blocked time as private appointments in work calendar
          newEvent.setColor('9');
          newEvent.removeAllReminders(); // so you don't get double notifications. Delete this if you want to keep the default reminders for your newly created primary calendar events
          primaryEventsCreated.push(newEvent.getId());
          Logger.log('PRIMARY EVENT CREATED'
                     + '\nprimaryId: ' + newEvent.getId() + '\nprimaryTitle: ' + newEvent.getTitle() + '\nprimaryDesc ' + newEvent.getDescription() + '\n');
        }
      }
    
      // if a primary event previously created no longer exists in the secondary calendar, delete it
      for (pev in primaryEventsFiltered)
      {
        var pevIsUpdatedIndex = primaryEventsUpdated.indexOf(primaryEventsFiltered[pev].getId());
        if (pevIsUpdatedIndex == -1)
        { 
          var pevIdToDelete = primaryEventsFiltered[pev].getId();
          Logger.log(pevIdToDelete + ' deleted');
          primaryEventsDeleted.push(pevIdToDelete);
          primaryEventsFiltered[pev].deleteEvent();
        }
      }  
    
      Logger.log('Primary events previously created: ' + primaryEventsFiltered.length);
      Logger.log('Primary events updated: ' + primaryEventsUpdated.length);
      Logger.log('Primary events deleted: ' + primaryEventsDeleted.length);
      Logger.log('Primary events created: ' + primaryEventsCreated.length);
    
      lock.releaseLock();
    }```

[Simultaneous script executions][1]
[Trigger][2]
[Trigger Settings][3]


  [1]: https://i.sstatic.net/AcbJU.png
  [2]: https://i.sstatic.net/u6giq.png
  [3]: https://i.sstatic.net/hG93W.png

Solution

  • Posting this for documentation purposes.

    This might be a bug:

    The behavior you're describing (EventUpdateTrigger -as well as EventOpenTrigger firing multiple times) might be a bug, and is currently being investigated on Google Issue Tracker:

    Please consider starring the referenced issue in order to keep track of it and to help prioritizing it.

    Workaround:

    As doubleunary mentioned, use Lock.hasLock() to avoid successive trigger executions causing the event to be duplicated multiple times.