I am trying to configure a Linear Gauge in Report Builder. I have defined two pointers one is the sum of valid items, the second is the sum of items affected by data quality.
There is a property called "Bar Start" which has two default values (Scalestart and Zero) which I am presuming sets where the start of the drawn bar is placed on the scale (i.e. if pointer value is 12 then bar goes from scalestart to 12).
I want my second pointer (DQ) to start where the first pointer (Valid) finishes. I have tried calculated values as an expression, I have tried a simple fixed value as an expression, but the bar always want to plot from the start of the scale.
Has anyone any ideas whether what I am trying to do is achievable, and if so, how I can do it?
Still using Linear Gauge, right mouse click and select add range. Modify the end and start values and change placement to outside. This maybe what you are looking for.