I have done a decent bit of research and have come up empty, I am looking for a way to assign multiple schedules to the same report in Cognos. I would like a given report to be emailed to different users at different times. I was looking into creating a Cognos job and trying to customize the subscription that way but haven't come up with anything yet. All of the methods I have tried strictly in Cognos Connection, from the UI. So, does anyone know if it is possible to have more than one schedule on a single report and going to different recipients each time?
Thank you in advance
I got it, created two separate report views in Cognos that run the same report. Then edit each report view with the required schedule and different email recipients as needed.