How to estimate download time remaining (accurately)?


Sure you could divide the remaining file size by the current download speed, but if your download speed fluctuates (and it will), this doesn't produce a very nice result. What's a better algorithm for producing smoother countdowns?


Solution

  • I wrote an algorithm years ago to predict time remaining in a disk imaging and multicasting program that used a moving average with a reset when the current throughput went outside of a predefined range. It would keep things smooth unless something drastic happened, then it would adjust quickly and then return to a moving average again. See example chart here:

    enter image description here

    The thick blue line in that example chart is the actual throughput over time. Notice the low throughput during the first half of the transfer and then it jumps up dramatically in the second half. The orange line is an overall average. Notice that it never adjusts up far enough to ever give an accurate prediction of how long it will take to finish. The gray line is a moving average (i.e. the average of the last N data points - in this graph N is 5, but in reality, N might need to be larger to smooth enough). It recovers more quickly, but still takes a while to adjust. It will take more time the larger N is. So if your data is pretty noisy, then N will have to be larger and the recovery time will be longer.

    The green line is the algorithm I used. It goes along just like a moving average, but when the data moves outside a predefined range (designated by the light thin blue and yellow lines), it resets the moving average and jumps up immediately. The predefined range can also be based on standard deviation so it can adjust to how noisy the data is automatically. I just threw these values into Excel to diagram them for this answer so it's not perfect, but you get the idea.

    Data could be contrived to make this algorithm fail to be a good predictor of time remaining though. The bottom line is that you need to have a general idea of how you expect the data to behave and pick an algorithm accordingly. My algorithm worked well for the data sets I was seeing, so we kept using it.

    One other important tip is that usually developers ignore setup and teardown times in their progress bars and time estimate calculations. This results in the eternal 99% or 100% progress bar that just sits there for a long time (while caches are being flushed or other cleanup work is happening) or wild early estimates when the scanning of directories or other setup work happens, accruing time but not accruing any percentage progress, which throws everything off. You can run several tests that include the setup and teardown times and come up with an estimate of how long those times are on average or based on the size of the job and add that time to the progress bar. For example, the first 5% of work is setup work and the last 10% is teardown work and then the 85% in the middle is the download or whatever repeating process your tracking is. This can help a lot too.