I've a assertion fail with my gtk+/C code, so, I don't know why :
The error is : g_date_set_month: assertion 'g_date_valid_month (m)' failed
And the suspected lines are:
t_day day;
uint y, m, da;
gtk_calendar_get_date(GTK_CALENDAR(d->calendar), &y, &m, &da);
g_date_set_day(&day.date, da);
g_date_set_year(&day.date, y);
g_date_set_month(&day.date, m);
it's the only function which I use g_date_set_month().
Thanks for reading
GtkCalendar returns a month value between 0-11:
month : location to store the month number (between 0 and 11), or NULL. [out][allow-none]
GDate uses month values between 1-12 (see the internal representation and the enum type used in the setter):
guint month : 4; the day of the day-month-year representation of the date, as a number between 1 and 12
You will presumably need to convert between the two formats.