Is there a way with Play 1 to have multiple schedules for the same job?
I would like one of my job to run at certain times daily and different times at the week ends.
Up to now it wasn't possible to have the same job with different schedule altough the work around described by Seb would do the trick.
However there is now a new module called Multi Jobs which allows to have several methods defined with their own schedule.